Evidence

Claims bounded by evidence.

Public statements are bounded by available evidence. Technology descriptions and artwork do not establish measured performance, production readiness or suitability for a particular deployment. Evaluation results must be read with their methods, conditions and limitations.

BDAS evaluation resources

VAREXIS was awarded 5,000 GPU hours through the UKRI AI Research Resource (AIRR) for BDAS evaluation on Isambard-AI.

This is an allocation of compute access. It is not a measured product result or a product endorsement.

Programme context

Demonstrations

To discuss a demonstration, contact VAREXIS with the technology and use case you would like to evaluate. Scope and access are agreed directly.

Discuss a demonstration

V-INDEX local validation

V-INDEX v0.8b completed 793/793 local tests; disposable PostgreSQL 18.6 validation completed 45/45 on the fresh 0001→0002→0003 path and 43/43 on the controlled 0001+0002→0003 upgrade path.

Internal/local and disposable integration evidence only. This is not production deployment validation, independent verification or certification. No public V-INDEX runtime API is currently offered.

V-INDEX architecture and current status

Interpreting public material

Product artwork identifies a technology; it is not evidence of performance. Programme membership and awarded compute access are recorded separately from evaluation outcomes.

Public definitions and authority boundaries