{"schema":"varexis-index-free-publication-preview/1","catalogue_version":"dora-80-v1","route_id":"agentic_reviewed_dora_subcontract_contract_adjustment_timeline","record_id":"VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1","question":"Is there a documented and justified plan for necessary subcontracting contract changes?","answer":"Contract changes necessary to comply with the subcontracting regulation are implemented in a timely manner and as soon as possible, and the financial entity documents the planned implementation timeline. Review implication: Compare the cited requirement with the specified documentary evidence for this decision. A source requirement does not prove that a supplier or financial entity has satisfied it.","records":[{"record_id":"VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1","url":"/varexis-index/records/dora-subcontract-contract-adjustment-timeline.json","content_sha256":"05b966a08c2bba9a4157a7a06ee448003d8de8603aa77ac491918c6884321b37","evidence":{"schema":"varexis-public-evidence-record/0.3","generated_at_utc":"2026-11-16T20:16:47.445192+00:00","record_id":"VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1","record_kind":"external_reference","title":"DORA: Document the timeline for necessary contract adjustments","system":"European Commission","evidence_family":"vendor_evidence_review","index_status":"PUBLIC_SAFE_SOURCE_REVIEW","evidence_state":"PRIMARY_DOCUMENTATION_REVIEW_ONLY","canonical_question":"Is there a documented and justified plan for necessary subcontracting contract changes?","near_questions":["Is there a documented and justified plan for necessary subcontracting contract changes?","What does Article 4(2) require for document the timeline for necessary contract adjustments?","Which documentary artefacts support document the timeline for necessary contract adjustments?","What prevents reliance on a conclusion about document the timeline for necessary contract adjustments?"],"supported_claims":[{"claim":"Contract changes necessary to comply with the subcontracting regulation are implemented in a timely manner and as soon as possible, and the financial entity documents the planned implementation timeline.","reliance":"PRIMARY_DOCUMENTATION_REVIEW_ONLY"}],"not_demonstrated_claims":["Buyer-specific applicability, actual implementation and compliance are not independently demonstrated.","Unresolved entity, territorial or function applicability Stale, superseded, incomplete or conflicting source or contract evidence Missing artefacts or dates needed for the proposed conclusion A self-selected future deadline is not an exemption from timely implementation.","A self-selected future deadline is not an exemption from timely implementation.","No supplier approval, legal advice, certification, runtime verification or new paid capability."],"public_summary":"Contract changes necessary to comply with the subcontracting regulation are implemented in a timely manner and as soon as possible, and the financial entity documents the planned implementation timeline. Review implication: Compare the cited requirement with the specified documentary evidence for this decision. A source requirement does not prove that a supplier or financial entity has satisfied it.","related_record_ids":[],"source_review":{"source_type":"official_external_documentation","source_title":"Delegated Regulation (EU) 2025/532: ICT subcontracting requirements","source_url":"https://eur-lex.europa.eu/eli/reg_del/2025/532/oj/eng","checked_on":"2026-11-16","candidate_record_id":"VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1","candidate_record_sha256":"c2a1abbf096cfbfed23e093d286a607e84c419d93116c4c6f2dfbb7cbf7de407","method":"Primary documentation reviewed for the published bounded statement.","deployment_tested_by_varexis":false,"revalidation":"The delivered snapshot preserves the review date shown. Recheck current primary documentation and deployment context before relying on present applicability; payment does not trigger fresh research."},"answer_policy":{"classification":"DOCUMENTED_WITH_DEPLOYMENT_BOUNDARY","bounded_answer":"Contract changes necessary to comply with the subcontracting regulation are implemented in a timely manner and as soon as possible, and the financial entity documents the planned implementation timeline. Review implication: Compare the cited requirement with the specified documentary evidence for this decision. A source requirement does not prove that a supplier or financial entity has satisfied it.","required_buyer_context":"Gap assessment against effective requirements; Planned implementation timeline; Progress and unresolved contractual constraints","missing_evidence":"A broader claim needs evidence matching the intended use. Payment does not upgrade the evidence state."},"private_boundary":"Raw logs, thresholds, private paths, source code, protected mechanisms and reconstruction-level details are excluded from public and paid delivery.","decision_profile":{"schema":"varexis-vendor-evidence-review/1","review_status":"documentation_review_only","legal_applicability":{"status":"CONDITIONALLY_APPLICABLE","applicability_date":"2025-07-22","controlling_provision":"Article 4(2)","operator":"Financial entity within DORA Article 2, subject to exclusions and applicable Member State option; relevant contractual obligations involve its ICT provider","territorial_scope":"DORA Article 2 financial entities, with stated exclusions and any applicable Member State option; no automatic applicability to a UK-only enterprise.","conditions_and_exceptions":"Relevant financial-entity/provider contracts for critical or important functions or material parts; no universal grace-period date is created by this clause. Applicable only after entity, service and function classification is established. DORA applies from 17 January 2025; no UK-only entity coverage is inferred. Delegated Regulation (EU) 2025/532 entered into force on 22 July 2025.","individual_compliance_determined":false,"guidance_is_binding":false},"applicability_status":"Relevant financial-entity/provider contracts for critical or important functions or material parts; no universal grace-period date is created by this clause. Applicable only after entity, service and function classification is established. DORA applies from 17 January 2025; no UK-only entity coverage is inferred. Delegated Regulation (EU) 2025/532 entered into force on 22 July 2025.","checked_on":"2026-11-16","claim_to_check":"Is there a documented and justified plan for necessary subcontracting contract changes?","documented_statement":{"status":"documented","statement":"Contract changes necessary to comply with the subcontracting regulation are implemented in a timely manner and as soon as possible, and the financial entity documents the planned implementation timeline.","source_ids":["subcontracting","dora"]},"review_inference":{"status":"review_inference","statement":"Compare the cited requirement with the specified documentary evidence for this decision. A source requirement does not prove that a supplier or financial entity has satisfied it.","source_ids":["subcontracting","dora"]},"buyer_evidence_required":["Gap assessment against effective requirements","Planned implementation timeline","Progress and unresolved contractual constraints"],"review_condition":{"status":"varexis_review_policy","statement":"Unresolved entity, territorial or function applicability Stale, superseded, incomplete or conflicting source or contract evidence Missing artefacts or dates needed for the proposed conclusion A self-selected future deadline is not an exemption from timely implementation."},"unknowns":["Actual entity scope and implementation are unestablished without buyer evidence","No supplier, deployment, independent buyer demand or paid-product fit verified"],"unknown_finding":{"status":"unknown","statement":"No enterprise, supplier or provider deployment has been tested. Applicability and implementation remain buyer-specific."},"evidence_sources":[{"source_id":"subcontracting","url":"https://eur-lex.europa.eu/eli/reg_del/2025/532/oj/eng","title":"Delegated Regulation (EU) 2025/532: ICT subcontracting requirements","publisher":"European Commission","publication_date":"2025-07-02","reviewed_date":"2026-11-16","version":"Original OJ text; entered into force 2025-07-22","captured_at":"2026-11-16T19:35:34.524272+00:00","status":200,"sha256":"046b19a5265a6c2e99b42d9b5556775726ac68d7827bca67d96e13c2ee16786d","text_sha256":"baf68ee5fb109c6a658f21f1824e0f815fe4f387e08d727a176150d895781346","bytes":324026,"capture_status":"captured_primary_source","capture_kind":"official HTTP response bytes; rendered text separately hashed; HTML/consolidation is not authentic OJ PDF","authentic_oj_byte_hash":null,"hash_basis":"Original HTTP response bytes and raw extracted text are separately hashed. HTML and consolidated documentary text are NOT authentic OJ PDFs; the labelled corrigendum PDF is an authentic OJ capture. Applicable original and amending OJ texts control.","rights_disposition":"Concise original analysis with official EU attribution. Source bodies retained privately; no Commission, Council or Parliament endorsement.","licence_url":null},{"source_id":"dora","url":"https://eur-lex.europa.eu/eli/reg/2022/2554/oj/eng","title":"Regulation (EU) 2022/2554 on digital operational resilience for the financial sector","publisher":"European Parliament and Council of the European Union","publication_date":"2022-12-27","reviewed_date":"2026-11-16","version":"Original OJ legal text; current listed version checked 2026-11-16","captured_at":"2026-11-16T19:35:34.522784+00:00","status":200,"sha256":"a748c4ae5f4e19f3dc1ea76a1f04c040159992c36496f0263895013bc192e7f3","text_sha256":"a60d439975b38f11da10152cd735f208cb9dd48d2926b34ee221855b609ec668","bytes":1013007,"capture_status":"captured_primary_source","capture_kind":"official HTTP response bytes; rendered text separately hashed; HTML/consolidation is not authentic OJ PDF","authentic_oj_byte_hash":null,"hash_basis":"Original HTTP response bytes and raw extracted text are separately hashed. HTML and consolidated documentary text are NOT authentic OJ PDFs; the labelled corrigendum PDF is an authentic OJ capture. Applicable original and amending OJ texts control.","rights_disposition":"Concise original analysis with official EU attribution. Source bodies retained privately; no Commission, Council or Parliament endorsement.","licence_url":null}],"supporting_passages":[{"source_id":"subcontracting","precise_reference":"Article 4(2)","start_character":23686,"end_character":27366,"offset_unit":"Unicode code points","anchor":"planned timeline","passage_sha256":"8ba558d8ca2734643d5d100e8d620b7abe638ee6d6c49b312801fda6e20a77b8","source_sha256":"046b19a5265a6c2e99b42d9b5556775726ac68d7827bca67d96e13c2ee16786d","text_sha256":"baf68ee5fb109c6a658f21f1824e0f815fe4f387e08d727a176150d895781346","text_reconstruction":"UTF-8 decode of raw captured text, CRLF/CR normalized to LF, then Unicode-code-point offsets; raw text_sha256 and normalized passage_sha256 have different byte bases.","full_source_sha256":"046b19a5265a6c2e99b42d9b5556775726ac68d7827bca67d96e13c2ee16786d"}],"observed_deployment":false,"commercial_reliance_boundary":"Free source evidence only. No supplier approval, legal advice, compliance certification, live verification or paid checker fit is established.","paid_value":{"free":"Full documentary evidence, provenance and limitations.","single_request":"Unavailable for this catalogue-only addition; existing eligible saving unchanged.","evidence_receipt":"Unavailable for this catalogue-only addition.","existing_licensed_products":"Unchanged; separately supported declaration inputs only, no supplier or regulatory determination.","excluded":["Legal compliance determination","Supplier certification","Runtime enforcement","Verified deletion","Expanded entitlement"]},"revalidation":{"trigger":"Relevant primary source, legal effective date, contract or supplier service changes; no ongoing monitoring included.","specific_watch":"Recheck controlling official texts, corrigenda, applicable authority instructions and dated service-specific documents before relying on this condition."},"buyer_relevance":"Concrete contract remediation governance decision: Is there a documented and justified plan for necessary subcontracting contract changes?","refusal_conditions":["Unresolved entity, territorial or function applicability Stale, superseded, incomplete or conflicting source or contract evidence Missing artefacts or dates needed for the proposed conclusion A self-selected future deadline is not an exemption from timely implementation.","Missing, stale, superseded, wrong-jurisdiction or conflicting evidence prevents reliance on the intended determination.","Documentation and signed supplier declarations do not establish independent runtime enforcement or observed outcomes."],"decision_context":{"operator":"Contract remediation governance","scenario":"Is there a documented and justified plan for necessary subcontracting contract changes?","consequence":"Concrete contract remediation governance decision: Is there a documented and justified plan for necessary subcontracting contract changes?","workflow":"subcontracting_oversight","confidence":"Source-qualified documentary decision only; independent buyer value and paid demand remain unestablished."},"novelty_review":{"candidate_id":"DORA-S11","disposition":"new_distinct","nearest_record_id":"VXI-EXT-PROCUREMENT-INTOTO-MODIFY-HASH-NOT-SEMANTIC-CHANGE-01-v1","nearest_record_url":"/varexis-index/records/intoto-modify-hash-not-semantic-change.json","nearest_record_sha256":"21a68d13031c503e8b6d618bf03a0e62fe7933e16a27784e53897f195827df7e","material_distinction":"DORA-specific actor, legal applicability and the precise requirement in Article 4(2) are not established by the cited comparator. Independent semantic challenge found a distinct documentary decision; no paid or runtime capability follows.","review_status":"Independent reviewer challenge completed; reviewer receipt is not customer evaluation or supplier attestation.","counterexample":"A self-selected future deadline is not an exemption from timely implementation."},"optional_selection":{"guide_id":null,"guide_url":null,"guide_manifest":"/varexis-index/decision-guides.json","placement":"Contextual technical follow-on only; this supplier/legal decision is not assessed by the guide or checker. Existing guide records and trial paths remain unchanged.","checker":null,"boundary":"Free exact-ID record access only. Existing guides, experiments, frozen semantic search and paid tools are unchanged; no DORA checker or purchase fit is established."},"exact_access":{"endpoint":"/mcp/catalogue","tool":"get_publication_record","arguments":{"record_id":"VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1"},"record_url":"/varexis-index/records/dora-subcontract-contract-adjustment-timeline.json","original_mcp_search":false,"paid_saved_retrieval":false}},"niche":{"niche_id":"dora80-governance","label":"Agent Governance & Policy Boundaries","classification_id":"governance","classification_label":"Agent Governance & Policy Boundaries","topic_id":"governance","buyer_intent":"Concrete contract remediation governance decision: Is there a documented and justified plan for necessary subcontracting contract changes?","comparison_role":"supplementary_discovery"},"paid_access_note":"Complete free source evidence via exact HTTP and /mcp/catalogue. Paid saving and licensed checker fit are not available for this record; existing eligible offers are unchanged.","service_route":{"request_guide":"/varexis-index/request.html","request_workflow":"/varexis-index/request-workflow.json","service_id":"public_discovery","service_routes_url":"/varexis-index/service-routes.json","payment_required":false,"availability_endpoint":"/api/index/capabilities","operational_status":"PUBLIC_DISCOVERY_LIVE","checkout_url":null},"authority_boundary":"VAREXIS-INDEX informs evidence reliance. It does not provide advice, certification, deployment authority, security assurance, production approval, or guarantee.","human_page":"/varexis-index/catalog.html#dora-subcontract-contract-adjustment-timeline","machine_readable_record":"/varexis-index/records/dora-subcontract-contract-adjustment-timeline.json"}}],"access":{"mode":"exact_http_only","payment_required":false,"purchase_url":null,"mcp_preview_available":false,"paid_saved_retrieval_available":false,"natural_language_search_qualified":false},"boundary":"Free exact HTTP and /mcp/catalogue retrieval. Original /mcp search and preview, paid saved retrieval and enhanced natural-language qualification are not extended. Documentary evidence and review inference do not establish supplier approval, legal compliance or runtime enforcement.","source_rights_notice":{"id":"dora80-primary-source-attribution","url":"/varexis-index/publications/dora-80-v1/source-rights.json","heading":"EU legal sources and status","description":"Original bounded analysis of legal provisions, with documentary evidence and inference kept separate.","record_ids":["VXI-EXT-DORA80-DORA-OUTSOURCING-RESPONSIBILITY-01-v1","VXI-EXT-DORA80-DORA-THIRD-PARTY-STRATEGY-EXEMPTIONS-01-v1","VXI-EXT-DORA80-DORA-REGISTER-ALL-ICT-ARRANGEMENTS-01-v1","VXI-EXT-DORA80-DORA-PRECONTRACT-CONFLICT-ASSESSMENT-01-v1","VXI-EXT-DORA80-DORA-COMPLEX-SERVICE-AUDITOR-COMPETENCE-01-v1","VXI-EXT-DORA80-DORA-TESTED-EXIT-PLANS-01-v1","VXI-EXT-DORA80-DORA-CONCENTRATION-SUBSTITUTABILITY-01-v1","VXI-EXT-DORA80-DORA-DURABLE-COMPLETE-CONTRACT-01-v1","VXI-EXT-DORA80-DORA-SERVICE-DATA-LOCATION-NOTICE-01-v1","VXI-EXT-DORA80-DORA-INCIDENT-ASSISTANCE-COST-01-v1","VXI-EXT-DORA80-DORA-AUDIT-RIGHTS-MICROENTERPRISE-BOUNDARY-01-v1","VXI-EXT-DORA80-DORA-EXIT-TRANSITION-CONTINUITY-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACTOR-IDENTIFICATION-CAPABILITY-01-v1","VXI-EXT-DORA80-DORA-PERIODIC-SUBCONTRACT-RISK-REASSESSMENT-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACT-CHAIN-CONTINUITY-01-v1","VXI-EXT-DORA80-DORA-MATERIAL-SUBCONTRACT-CHANGE-WINDOW-01-v1","VXI-EXT-DORA80-DORA-REGISTER-CHAIN-RANK-01-v1","VXI-EXT-DORA80-DORA-REGISTER-DIRECT-VERSUS-UNDERPINNING-SCOPE-01-v1","VXI-EXT-DORA80-DORA-REGISTER-PROVIDER-IDENTIFIERS-01-v1","VXI-EXT-DORA80-DORA-REGISTER-SINGLE-VALUE-ROWS-01-v1","VXI-EXT-DORA80-DORA-SUPERVISORY-REGISTER-REPORTING-01-v1","VXI-EXT-DORA80-DORA-PLANNED-CRITICAL-NOTIFICATION-01-v1","VXI-EXT-DORA80-DORA-PRECONTRACT-DUE-DILIGENCE-01-v1","VXI-EXT-DORA80-DORA-PROVIDER-SECURITY-STANDARDS-01-v1","VXI-EXT-DORA80-DORA-RISK-BASED-AUDIT-PROGRAMME-01-v1","VXI-EXT-DORA80-DORA-CONTRACT-TERMINATION-TRIGGERS-01-v1","VXI-EXT-DORA80-DORA-INSOLVENCY-AND-THIRD-COUNTRY-ENFORCEMENT-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACT-CHAIN-SUPERVISABILITY-01-v1","VXI-EXT-DORA80-DORA-SERVICE-SCOPE-AND-SUBCONTRACT-PERMISSION-01-v1","VXI-EXT-DORA80-DORA-DATA-PROTECTION-AND-RETURN-CLAUSES-01-v1","VXI-EXT-DORA80-DORA-AUTHORITY-COOPERATION-CLAUSE-01-v1","VXI-EXT-DORA80-DORA-PROVIDER-TRAINING-PARTICIPATION-01-v1","VXI-EXT-DORA80-DORA-CRITICAL-SERVICE-PERFORMANCE-REPORTING-01-v1","VXI-EXT-DORA80-DORA-PROVIDER-CONTINGENCY-TESTING-01-v1","VXI-EXT-DORA80-DORA-TLPT-PROVIDER-COOPERATION-01-v1","VXI-EXT-DORA80-DORA-CONSISTENT-GROUP-SUBCONTRACTING-01-v1","VXI-EXT-DORA80-DORA-PROVIDER-SUBCONTRACTOR-ASSESSMENT-CAPACITY-01-v1","VXI-EXT-DORA80-DORA-FINANCIAL-ENTITY-SUBCONTRACT-MONITORING-CAPACITY-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACTOR-ACCESS-RIGHTS-FLOWDOWN-01-v1","VXI-EXT-DORA80-DORA-CHAIN-MONITORING-AND-REPORTING-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTINGENCY-SECURITY-FLOWDOWN-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1","VXI-EXT-DORA80-DORA-SUBCONTRACT-OBJECTION-AND-TERMINATION-01-v1","VXI-EXT-DORA80-DORA-REGISTER-QUALITY-AND-CORRECTION-01-v1","VXI-EXT-DORA80-DORA-UNASSESSED-FUNCTION-AND-RECOVERY-CODES-01-v1","VXI-EXT-DORA80-DORA-REGISTER-STORAGE-PROCESSING-LOCATIONS-01-v1","VXI-EXT-DORA80-DORA-REGISTER-ALTERNATIVE-PROVIDER-ASSESSMENT-01-v1"],"attribution":"Sources: European Parliament and Council Regulation (EU) 2022/2554; Commission Implementing Regulation (EU) 2024/2956 and its 19 September 2025 corrigendum; Delegated Regulation (EU) 2025/532. Source titles, dates, versions, URLs and capture hashes are bound in each record.","disclaimer":"No EU institution endorsement. This is not legal advice, certification, deployment approval or independently observed compliance. Hashes identify the labelled captured source, not an authentic OJ document unless expressly stated.","notice_text_origin":"Original attribution and limitations; no source-body redistribution.","source_bindings":[{"source_id":"dora","sha256":"a748c4ae5f4e19f3dc1ea76a1f04c040159992c36496f0263895013bc192e7f3","url":"https://eur-lex.europa.eu/eli/reg/2022/2554/oj/eng"},{"source_id":"subcontracting","sha256":"046b19a5265a6c2e99b42d9b5556775726ac68d7827bca67d96e13c2ee16786d","url":"https://eur-lex.europa.eu/eli/reg_del/2025/532/oj/eng"},{"source_id":"roi-corrected","sha256":"caa56802087abee7b065d4151e075f47a2247e3783860d9b510ed430d3fb5d76","url":"https://eur-lex.europa.eu/eli/reg_impl/2024/2956/2024-12-02/eng"},{"source_id":"roi-corrigendum","sha256":"fc48183e6de026f12ade7ffb76c0e79f9ca1a022a19bd408c9611bdcbe5666d2","url":"https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=OJ:L_202590725"}]},"catalogue_access":{"endpoint":"/mcp/catalogue","tool":"get_publication_record","arguments":{"record_id":"VXI-EXT-DORA80-DORA-SUBCONTRACT-CONTRACT-ADJUSTMENT-TIMELINE-01-v1"},"read_only":true,"payment_required":false,"natural_language_search_qualified":false,"historical_fields":"exact_http_only, mcp_available and mcp_preview_available retain the original HTTP publication and four-tool preview meanings; this additive field documents the separate catalogue connector."},"content_sha256":"60381a23917200f56873e464e24120dd13f42ea6037f8f7df047f51991e47414"}
